Consumer unit upgrades
Consumer Unit Upgrade Electrician in Castleford
Still on an old fuse box? A modern consumer unit protects each circuit separately and usually takes a day to fit.
With an older board, one faulty appliance can cut power to half the house. RCBOs protect each circuit on its own.
We test every circuit first, then label every way once the new board is in.
Time to upgrade if
- You still have fuse wire
- There is no RCD, or one for everything
- The board is plastic
- It buzzes or shows scorch marks
- Nothing is labelled
- You are adding a charger or extension
How it works
- Test first
Circuits and earthing.
- Fit and label
Metal board, every way named.
- Certify
Notified under Part P.
Fuse boards in Castleford
From pit-era terraces near the town centre to the estates at Airedale and Ferry Fryston, many Castleford homes still have an early board.
Questions
How long?
Usually a day.
Metal board?
Yes, required since 2016.
Paperwork?
An installation certificate and a Building Regulations certificate.